Concrete Pump Pipeline
Products

DN125 R180 90° 70MnMo

DN125 R180  90° 70MnMo
Twin wall bend pipe performance comprehensive description
Name Specification Structure Material Weight(KG) Manufacture
process
Dimension and degree tolerance Pressure Weld tensile strength Surface coating
Twin wall bend pipe DN125 R180 90° Compound structure 70MnMo+
ST52
12.2 Pushed/quenched/
automatic welding
<1mm
<1°
160bar >580bar Baking paint

Lifetime(Conventional working environment):670Working Hours( The average data from the survey of  100 customers in 26 countries)

Application:Generally used for PM/SCHWING/JUNJIN/SANY/ZOOM concrete boom pump

Home|About Us|Products| Engineering Case| News|Contact Us|Sitemap

Tel.: +86-311-83076206 Fax:+86-311-83076206E-mail: rh@runhgk.com / tuig@runhgk.com

Copyright © 2014 Hebei Runhong Construction Machinery Manufacture(Pipeline)Co.,Ltd. All Rights Reserved